Project Description

Rabigh 2 IPP-FF project

Start Date: Sep. 18, 2014
End Date: Dec. 06, 2015

Client:

Samsung C&T Corporation

Rabigh 2 IPP (R2IPP) is a Combined Cycle Power Station project under construction on the western coast of Saudi Arabia, 150 km north of Jeddah with an installed electrical generating capacity of 2,060 megawatts to supply Makkah Province with electric power

The project will utilize Natural Gas as main fuel and Arabian Super Light (ASL) as backup fuel and with the application of Combined Cycle Power Station in a configuration of three blocks, each composed of two Gas Turbines of enhanced efficiency, two Heat Recovery Steam Generators and one triple pressure Steam Turbine.

Project Goal and Scope:

  • Review & Evaluate the installation package documents produced by fire protection contractor. Identify the format and contents of Safety and Fire Protection Packages which are to be submitted to the High Commission for Industrial Security (HCIS) as required in SAF-01.
  • Obtaining HCIS approval.