Marafiq YGTG Rehabilitation Project

Marafiq YGTG Rehabilitation Project 2020-08-05T16:34:55+03:00

Project Description

Marafiq YGTG Rehabilitation Project

Start Date:
July 2018

End Date:
Ongoing (FEED and Installation Package Completed)

Location:
Yanbu, Kingdom of Saudi Arabia

Your Content Goes Here

Client:

Sinsin

 Power, Desalination and Seawater Cooling (PD&SC) facilities complex of MARAFIQ referred hereinafter as MARAFIQ Yanbu, located in Yanbu Al- Saniyah, own and operate MYAS Power, Desalination and Seawater Cooling Facilities that generate, transmit and distribute water & electricity to industries and communities in Yanbu Al-Saniyah refer hereinafter as MYAS. Marafiq Power and Water Plant were constructed in 1980’s with various supporting plants and utilities.

 

Project Goal and Scope:

  • Prepare Front End Engineering package FEED which include fire hazard analysis, building code analysis, design basis, Identification of Fire Protection, Fire Detection, Alarm and design parameters, generic material, equipment specifications and all documents & drawings as required by HCIS directives (SAF-01).
  • Review & Evaluate the installation package documents produced by fire protection contractor. Identify the format and contents of Safety and Fire Protection Packages which are to be submitted to the High Commission for Industrial Security (HCIS) as required in SAF-01.
  • Participate in Testing and Commissioning

Obtaining HCIS approval.