KGOC GAS AND CONDENSATE EXPORT SYSTEM PROJECT

KGOC GAS AND CONDENSATE EXPORT SYSTEM PROJECT 2020-08-08T12:32:36+03:00

Project Description

KGOC GAS AND CONDENSATE EXPORT SYSTEM PROJECT

Start Date:
Mar. 21, 2016

FEED package Approval Date: Sep 18, 2016

End Date:
On Going

Your Content Goes Here

Location:

Kuwait

The project was planned to deliver a combination of lean gas, condensate and sour gas through a single 12” export pipeline from Al Khafji Joint Operations (KJO) facilities in Saudi Arabia to Kuwait Oil Company (KOC) tie-in facility, namely the Intermediate Slug Catcher being constructed under KOC Project No EF/1718 near Al-Ahmadi, Kuwait. The facilities will also assist KPC / KJO in achieving one of their primary targets of 1% flaring by reducing the gas flared and additionally monetize valuable hydrocarbon resources. Total export pipeline length is 110 kilometers,  with 4 kilometers onshore in Saudi Arabia, followed by 47 kilometers offshore and 59 kilometers onshore in Kuwait.

 

Project Goal and Scope:

  • Prepare Front End Engineering package FEED which include fire hazard analysis, building code analysis, design basis, Identification of Fire Protection, Fire Detection, Alarm and design parameters, generic material, equipment specifications and all documents & drawings as required by HCIS directives (SAF-01) and preparation of the tender
  • Review & Evaluate the installation package documents produced by fire protection contractor. Identify the format and contents of Safety and Fire Protection Packages which are to be submitted to the High Commission for Industrial Security (HCIS) as required in SAF-01.

Obtaining HCIS approval.