FIRE RISK ASSESSMENT OF SWCC FACILITIES

FIRE RISK ASSESSMENT OF SWCC FACILITIES 2020-08-12T11:32:29+03:00

Project Description

FIRE RISK ASSESSMENT OF SWCC FACILITIES

Start Date:
March 2020

Location:
All Plants in the Kingdom of Saudi Arabia

Your Content Goes Here

Client:

Saline Water Conversion Corporation

Project Title: FIRE RISK ASSESSMENT OF SWCC FACILITIES PROJECT NO. 68206

AJECS will conduct a Fire Risk assessment for the existing the fire protection system inclusive of fire risk findings and recommendations in fire protection at all the sites of the corporation to achieve the requirements of the High Commission for Industrial Security (HCIS) Safety and Fire.

 

Project Goal and Scope:

 

  • Prepare Front End Engineering package FEED which include fire hazard analysis, building code analysis, design basis, Identification of Fire Protection, Fire Detection, Alarm and design parameters, generic material, equipment specifications and all documents & drawings as required by HCIS directives (SAF-01).

Obtaining HCIS approval